Definition:
PCC is the first concrete work of any construction.
A layer of concrete (Cement:sand:Agg:water) above the SBFS is Known as PCC.
Mainly, Following Grade are mainly used-
Some Important Equation:
During Construction Work:
PCC is the first concrete work of any construction.
A layer of concrete (Cement:sand:Agg:water) above the SBFS is Known as PCC.
Mainly, Following Grade are mainly used-
- M10, (1:3:6) Generally Used
- M15, (1:2:4)
- M20, (1:1.5:3)
Some Important Equation:
- Thickness PCC Layer = 100 to 150mm
- Aggregate size = 40mm
During Construction Work:
- Spread concrete using Fanti.
- Compact using Rammer.
- If there are any surface void later fill it using cement mortar.